Tag: n-gauge

Heathfield – Diary – March 2016

March 2016  –  All boards were covered with cork tiles and the first track was laid on Board A. All track and points have dropper wires attached ready for connecting later. In order to try to make life easier we … read more

Heathfield – An Introduction

Introduction. When I joined the Club in late 2014 it had a part completed N Gauge layout by the name of Chertonwell. This was started by previous members who were of a far greater electronic mind than myself. Although not … read more